Connection of several external controls
Over 15,000 m of cable was required to connect different external controls to a biogas plant in line with industry standards. Röring was responsible for planning the entire electrical engineering, and developed a central control panel with which the operator can control, for example, a gas treatment plant, based 20 km away. The Röring employees had to have a head for heights, as some of the work was carried out at up to 35 m!