Updating a solar panel plant

As part of the modernisation of a solar panel plant with an output of 2.1 MW, Röring disassembled a 25-year old switch cabinet and revamped the low-voltage main distribution board. The modernisation work took current DIN standards and public utility guidelines into account. The energy production system was up and running again after just one day's work. Thanks to this modernisation, the operator is now also able to directly market electricity.

 